Klient: Oldcastle Infrastructure
Format: Fallstudie
Größe: 1,46 MB
Sprache: Englisch
Datum: 06.06.2025

Grit Removal System Provides Strength in the Storm

With aging infrastructure and frequent storm events, Gills Creek WWTP faced significant grit loading challenges. The grit removal system was put to the test during South Carolina’s wettest May on record – and delivered critical protection when flows surged.

During record-setting storms, the HeadCell® and Hydro GritCleanse™ system at Gills Creek WWTP proved its performance by capturing 25-30 tons of low-organic grit per event. While flooding impacted much of the state, the system protected the plant, ensuring uninterrupted operation and directing grit to landfill instead of throughout the treatment plant. This reliable performance during extreme weather reinforced the system’s value in safeguarding critical infrastructure and reducing maintenance burdens during high-flow, high-debris storm events.
Kostenloser Download
Bitte geben Sie Ihre Kontaktdaten ein und klicken Sie auf den Button „Herunterladen“. Sie erhalten dann eine E-Mail mit einem Link zum Herunterladen.
Mit dem Anklicken des nachstehenden Buttons willigen Sie ein, dass die B2B Media Group GmbH mit ihren verbundenen Unternehmen und Oldcastle Infrastructure Ihre Daten zu B2B-Marketingzwecken, insbesondere zur marketingbezogenen Kontaktaufnahme per E-Mail und Telefon, verarbeitet und speichert.

Sie können Ihre Einwilligung jederzeit durch eine E-Mail an unsubscribe@b2bmg.com (Betreff: Oldcastle Infrastructure) widerrufen. Weitere Informationen finden Sie in den Datenschutzhinweisen.

Datenschutz-/Herunterladebedingungen:

Datum: 1.8.2018

Klient

  • B2B Media Group GmbH, Bahnhofstraße 5, 91245 Simmelsdorf (B2B MG)

Partner

  • Oldcastle Infrastructure
Felder mit * sind Pflichtfelder